Operation Fault Line (2018) XXIII
Carpe Diem
Fri 11 Aug 2023
Ended
ORBAT
Key information
Operation Fault Line (2018) XXIII
Carpe Diem
Deploying
Situation
WIth the YFF seizing the hills east of KalaeNoowi, the only road into the hills has been cut off for the IS forces that are sandwiched between us and the YFF, meaning they won't be able to send QRF if we move into the area. Unsure what the YFF next moves are, HQ has moved a nearby squad with a sniper attachment from COP Raven to take the area. Continue readingThis ORBAT
Complete
Attributes
Deployment contacts
- FL Runs the night and leads the ORBAT.
- SA Runs the server and the mod set.
- IO Runs the mission support team as the game master.
Campaign
Deployment XXIII of the Operation Fault Line (2018) campaign.
Open the campaign