Operation Fault Line (2018) XXIV
Stopping Power
Sun 27 Aug 2023
Ended
ORBAT
Key information
Operation Fault Line (2018) XXIV
Stopping Power
Deploying
Situation
IS Forces have been spotted staging forces WEST side of the AO, intel suggest they are planning to attack south through a large valley, codename "Six Flags". US and YNA High command have planned a combined offensive to stop the attack in its tracks before it can start. US elements are tasked with taking pushing trough IS Fortified positions into the enemy staging area, whilst the YNA will execute a offensive to our SW to stop any forces that have past our assigned AO. Continue readingThis ORBAT
Complete
Attributes
Time of day
DawnWeather
Clear SkiesType
Counter-insurgencyLoadouts
US Army Rangers (CUP/Multicam)Deployment contacts
- FL Runs the night and leads the ORBAT.
- SA Runs the server and the mod set.
- IO Runs the mission support team as the game master.
Campaign
Deployment XXIV of the Operation Fault Line (2018) campaign.
Open the campaign