UNITAF Future
UNITAF

Caution

This site is a work in progress

This site is finished to different degrees. Feedback is welcome. Please bear in mind that most of what you see, if not everything, is still a work in progress.

Data from the live site is synced here every hour. Anything you do on this site stays here. It is not copied back to the live site until we switch over.

Discord and permissions are linked. Be careful with admin actions. Some of them also change Discord.

UNITAF members taking orders before an operation
Force Manual

The FM outlines our core skills, policies and guides to ensure every member stands ready for the mission ahead.

FM/BG-1793 · v1.00

Planning for construction

Code
FM/BG-1793
Kind
Guide
Version
v1.00 3mos ago
Views
129
Platforms
As its document
Published by
Cpl Ross 26 Jun 2026
Last material change
v1.00 Initial Version

Planning for construction

Construction projects should be planned before deployment, particularly when building large compounds or defensive positions.

Key considerations:

  • Use terrain effectively
    • Take advantage of elevated positions and existing structures
    • Ensure sufficient flat ground for construction
  • Consider surrounding terrain
    • Use natural obstacles such as rivers or steep slopes
    • Avoid locations overlooked by nearby high ground or concealed approaches
  • Maintain access
    • Consider proximity to roads and supply routes where regular access is required
    • Avoid creating predictable approaches to defensive positions
  • Partition the site
    • Separate key facilities to reduce the effects of attack or accidents
    • Use barriers and walls to limit blast effects and line of sight between sensitive areas

Where it appears

On role cards

No role card holds this passage yet.