-
Vehicles 147
-
Light vehicles
-
Armoured vehicles
-
Tiltrotor aircraft
-
Naval craft
-
Vehicle-mounted weapons
-
-
Planning and Execution 155
-
Theatres and Campaigns
-
-
FMDG Communications
-
Radio Comms (Staging)
-
Reports (Staging)
-
FMDG Field Leadership
-
-
FMDG Rotary Wing
-
Loadout (Temp)
-
UNIHELP
Every role card
Command & Control
Ground Operations
-
Core Infantry 13
- Assistant Automatic Rifleman Verified
- Rifleman Verified
- Ammo Bearer Verified
- Grenadier Verified
- Automatic Rifleman Verified
- Interpreter Verified
- Assistant Machinegunner Verified
- Assistant Machinegunner, Heavy Verified
- Machinegunner, Medium Verified
- Machinegunner, Heavy Verified
- SF Operator Verified
- SF Gunner Verified
- Rifleman (Leadership Observer) Verified
-
Cavalry 12
- Light Vehicle Crewman (Driver) Verified
- Light Vehicle Crewman (Gunner) Verified
- Light Vehicle Crewman (Commander) Verified
- Light Vehicle Section Commander Verified
- AFV Crewman (Driver) Verified
- AFV Crewman (Gunner) Verified
- AFV Crewman (Commander) Verified
- AFV Section Commander Verified
- MBT Crewman (Driver) Verified
- MBT Crewman (Gunner) Verified
- MBT Crewman (Commander) Verified
- MBT Section Commander Verified
Air Operations
Support Operations
Scenario Operations
-
Mission Support 11
- War Correspondent Verified
- Civillian Roleplayer Verified
- Assistant Game Master Verified
- Mission Support Observer Verified
- Game Master (≤15) Verified
- Game Master (≤32) Verified
- Game Master (≤64) Verified
- OPFOR Roleplayer Verified
- Lead Game Master (≤15) Verified
- Lead Game Master (≤32) Verified
- Lead Game Master (≤64) Verified
FM/BG-246 · v1.01
Pre-slotting
- Code
- FM/BG-246
- Kind
- Guide
- Version
- v1.01 2yrs ago
- Views
- 396
- Platforms
- As its document
- Published by
- LtCol James 21 Jan 2024
- Last material change
- v1.00
No words changed between v1.00 and v1.01.
v1.00
Pre-slotting is a muster period that occurs after ORBAT creation and before ORBAT release. The pre-slotting stage is typically 24 hours before release. During the pre-slotting stage Leadership and Mission Support slots are opened ahead of general release - allowing members to see who the Leaders and Mission Support Team will be before slotting.
During the pre-slotting phase the assigned Field Leader and Mission Support Team also slot to ensure they are allocated before general release. No other roles are possible to be pre-slotted before general release and pre-slotting is a self served process - except as outlined in manual allocation.
v1.01
Pre-slotting is a muster period that occurs after ORBAT creation and before ORBAT release. The pre-slotting stage is typically 24 hours before release. During the pre-slotting stage Leadership and Mission Support slots are opened ahead of general release - allowing members to see who the Leaders and Mission Support Team will be before slotting.
During the pre-slotting phase the assigned Field Leader and Mission Support Team also slot to ensure they are allocated before general release. No other roles are possible to be pre-slotted before general release and pre-slotting is a self served process - except as outlined in manual allocation.
Pre-slotting is a muster period that occurs after ORBAT creation and before ORBAT release. The pre-slotting stage is typically 24 hours before release. During the pre-slotting stage Leadership and Mission Support slots are opened ahead of general release - allowing members to see who the Leaders and Mission Support Team will be before slotting.
During the pre-slotting phase the assigned Field Leader and Mission Support Team also slot to ensure they are allocated before general release. No other roles are possible to be pre-slotted before general release and pre-slotting is a self served process - except as outlined in manual allocation.
Where it appears
Lives in
FM/G51 ORBAT Slot AllocationOn role cards
No role card holds this passage yet.