UNITAF Future
UNITAF

Caution

This site is a work in progress

This site is finished to different degrees. Feedback is welcome. Please bear in mind that most of what you see, if not everything, is still a work in progress.

Data from the live site is synced here every hour. Anything you do on this site stays here. It is not copied back to the live site until we switch over.

Discord and permissions are linked. Be careful with admin actions. Some of them also change Discord.

Arma 3

Operation Giantsbane (1940s) XVIII

Battle for Gagolin Bridge (Armored)

Sat 5 Feb 2022

Ended

Operation Giantsbane (1940s) XVIII

Operation order

Warning order The full operations order is being reviewed by the commander. What is here is what has been released so far.

Situation

Background Information

[This starts 90 minutes into the main deployment, and this orbat is expected to last 90 minutes.]

War is rife across Europe and World War Two is in full swing. Allied forces are fighting for control of fronts all over the world.

In Baranow, Poland - Axis forces control all the north, fortified well in preparation for ally advances through the area and control all water crossings. With heavy bunkers and anti-tank guns in key locations along the river, this has completely stopped the Allied advance through Poland. This must change.

The Axis forces operate an airfield to the north east of the region and have occupied most of the towns with checkpoints along the main roads making travel by road difficult.

Our forces will conduct a daring night raid, with British Paracuting behind enemy lines to clear the path of AT Guns and AA positions for US Armored Divisions and Air Forces standing by in the South, culminating in the assault and capture of Bogoryja Airfield providing a strategic position for our advances.