Operation Hetman (2023) XX
Bieg mocy
Wed 14 Feb 2024
Ended
Operation Hetman (2023) XX
ALL CALLSIGNS shall STARTEX in Lembork before advancing east.
Phase 1:
DELTA 1 and DELTA 2 shall use the road as the axis of advance with DELTA 1 generally moving on the northern side, expected to take sectors 1-A through 1-C in parallel with 2. DELTA 2 should move alongside clearing the southern side of the road. This is a large AO so momentum shall be paramount.
BERSERKER 3 shall focus on ensuring that our flanks are secure and dealing with any QRF elements or vics within the AO so the infantry forces can focus on clearing.
It is expected there may be UXO within the town which DELTA 9 has an embedded engineer to make safe. Please mind your feet.
Following the securing of 1-C and 2-C it is anticipated ALL CALLSIGNS will log pack prior to assault on power plant in phase 2
Phase 2:
Largely planned in field based on contact however overall aim is to push into and retake Nadbor Power Plant with minimal damage to infrastructure. If required we shall hold this position against any QRF, if they come they are likely to come from the eastern 180.
Operation order
Situation
Background Information
While the Russian lines reshuffle we see a opportunity to take back Nadbor Powerplant
Friendly Forces
Friendly infantry platoon supported by vehicles
2x Infantry squad
2x Rosomak apc
Support element
2x Infantry squad
2x Rosomak apc
Support element
Enemy Forces
The enemy consist of motorized i infantry support: consisting of
BTR an GAZ mainly
BTR an GAZ mainly
Mission
Tasking
Secure and hold Nadbor powerplant
End-state
Successfully secured Nadbor powerplant
Execution
Commander's Intent
- Liberate Karlin
- Retake Nadbor Power Plant
- Cause minimum collateral damage to infrastructure
- Retake Nadbor Power Plant
- Cause minimum collateral damage to infrastructure
Tasks and Sequencing
ALL CALLSIGNS shall STARTEX in Lembork before advancing east.
Phase 1:
DELTA 1 and DELTA 2 shall use the road as the axis of advance with DELTA 1 generally moving on the northern side, expected to take sectors 1-A through 1-C in parallel with 2. DELTA 2 should move alongside clearing the southern side of the road. This is a large AO so momentum shall be paramount.
BERSERKER 3 shall focus on ensuring that our flanks are secure and dealing with any QRF elements or vics within the AO so the infantry forces can focus on clearing.
It is expected there may be UXO within the town which DELTA 9 has an embedded engineer to make safe. Please mind your feet.
Following the securing of 1-C and 2-C it is anticipated ALL CALLSIGNS will log pack prior to assault on power plant in phase 2
Phase 2:
Largely planned in field based on contact however overall aim is to push into and retake Nadbor Power Plant with minimal damage to infrastructure. If required we shall hold this position against any QRF, if they come they are likely to come from the eastern 180.Command/Signal
Considerations
45 - DELTA 9, DELTA 1, DELTA 2, BERSERKER 3
70 - DELTA 8, BISHOP 4
87 - DELTA 9, CROSSROAD H