Operation Everglade (1984) XXIV
Green Light (Part III)
Sun 4 Dec 2022
Ended
Operation Everglade (1984) XXIV
ORBAT
Key information
Operation Everglade (1984) XXIV
Green Light (Part III)
Deploying
Situation
With the main enemy artillery battery in the northern front successfully destroyed by the paratrooper platoon, they in desperate need of reinforcements and relief. Battalion HQ has deemed this an ideal opportunity to initiate a pre-planned large-scale counteroffensive through the British sector of Rosche to penetrate deep into the enemy positions that have long held the north. A troop of RAC Challenger tanks have been tasked with spearheading this assault, supported by additional infantry, logistical and medical personnel. Attention This ORBAT is taking part in a CSIP Leadership Trial of British Squad Structures which removes the 1st Fireteam Leader entirely. Squad Leaders will lead the 1st Fireteam and the radio structure will be different. Squad Leaders will be required to attend a pre-briefing for the CSIP and during the mission briefing test information will be outlined. Continue readingThis ORBAT
Complete
Missing mods for British Army (1984) DPM V2:
Open the mod presetAttributes
Deployment contacts
- FL Runs the night and leads the ORBAT.
- IO Runs the mission support team as the game master.
Campaign
Deployment XXIV of the Operation Everglade (1984) campaign.
Open the campaign