UNITAF Future
UNITAF

Caution

This site is a work in progress

This site is finished to different degrees. Feedback is welcome. Please bear in mind that most of what you see, if not everything, is still a work in progress.

Data from the live site is synced here every hour. Anything you do on this site stays here. It is not copied back to the live site until we switch over.

Discord and permissions are linked. Be careful with admin actions. Some of them also change Discord.

Arma 3

Operation Eiche (2025) X

Järvenkylä

Sun 1 Aug 2021

Ended

Operation Eiche (2025) X

Operation order

Situation

Background Information

Combined allied forces are stepping up the pressure in their liberation of the Virolahti region. The Canadian Joint Operations Command has arrived in the region and are preparing their landings on the South and South-Eastern coast of Virolahti. The Royal Marines and the Royal Armoured Corps have made solid progress towards a well-defended section of MSR Tiellä but have come across more fierce resistance than expected, and have dug in to their positions to await reinforcements.

In order to lend aid in the form of supplies and vehicles, the Bundeswehr forces from FOB Klamila have prepared an offensive to take a small garrisoned town by the name of Järvenkylä and secure a section of MSR Tiellä, linking up the front lines and providing an effective supply route.

Friendly Forces

4x Boxer
2x Eagle
1x AW159 Wildcat

Various trucks and APCs available for logistics
HM2 Merlin medium-lift helicopters for backup logistics

Supporting Assets

Helicopter support from the British will be provided for mobility and short range AA capability as well as ground observation. British forces are entrenched at their frontline to our east.

Enemy Forces

The russian infantry and mechanised forces are expected to be entrenched in hasty and deliberate fortifications protecting what's left of their eastern front with the German forces. After heavy fighting with the British earlier today, Russian forces are spread wider than usual and lack the heavy armour support we are used to.

The enemy is expected to attempt to hold ground at all costs, but is not expected to re-enforce from the north-west due to capability factors. The settlement to the North-East may provide reinforcements along Tiella or the rural road to the direct North of the AO.

Mission

Tasking

UNITAF forces are tasked with pushing West out of FOB Klamila and linking up the Allied front with the British AO near Ravijoki. The area West of Klamila is expected to be fairly empty; a UAV flight spotted no heat signatures in the woodland area East of Järvenkylä before it was shot down. Primary Tasking - (A) Secure MSR Tiellä up to the designated point to complete the front line link up - (B) Secure the town of Järvenkylä to keep MSR Tiellä secure - (C) Deliver supplies to the Vehicle Depot captured by British Forces Secondary Tasking - (D) Secure any remaining intel inside/ investigate the Officer Residence estate - (E) Secure any further pockets of enemy resistance and dug in positions scattered around the AO

End-state

Once the MSR is secured up to the 'secure limit' point, report in to the British Vehicle Depot with the designated supplies.

Execution

Commander's Intent

The purpose of this mission is to deliver supplies to the British front-line after heavy fighting during the day, secondly whilst on route, to clear the MSR and link the German and British front lines to create a new allied frontline. Whilst linking the frontlines, we will conduct a number of other objectives identified by intelligence sources.

Tasks and Sequencing

Note: this mission is being conducted during dusk and low visibility is expected, whilst night vision should not be required for effective execution, all personnel should be equipped with NVGs. Convoy - ALL Depart FOB Klamia toward Phase 0 - Convoy order will be SIERRA, QUEBEC, TANGO Phase 0 - ROMEO dismount and secure ROMEO 1 (North) and ROMEO 2 (South) sectors as indicated - Check officer residence for residual intelligence (OBJ D) - SIERRA support infantry from a rear line, protect MSR Tiella (OBJ A) - TANGO hold a rear supporting position and CCP in readiness - UNIFORM provide observation and report to FAC Phase 1 - ROMEO continue to clear MSR Tiella (OBJ A) and recce to assault Jarvenkyla (OBJ B) - SIERRA support infantry from a rear line, protect MSR Tiella and assist with Jarvenkyla assault - TANGO establish a support position and CCP, prepare LOGPAKs - ROMEO/SIERRA GO FIRM after OBJ B completion for LOGPAK Phase 2 - Movement orders for this phase and linking up with British forces will be confirmed during execution.

Administration/Logistics

Resupply

All teams will be supported in the mechanised ORBAT by a dedicated support and logistics team which will provide LOGPAKs as required by ground forces, vehicles will be serviced by a dedicated engineering attachment.

Medical

The primary means of medical support is ground based medical support attached to the support element.

Close Air Support

British helicopters will provide ground observation and short range AA capability.