UNITAF Future
UNITAF

Caution

This site is a work in progress

This site is finished to different degrees. Feedback is welcome. Please bear in mind that most of what you see, if not everything, is still a work in progress.

Data from the live site is synced here every hour. Anything you do on this site stays here. It is not copied back to the live site until we switch over.

Discord and permissions are linked. Be careful with admin actions. Some of them also change Discord.

Arma Reforger

Cold War Theatre (1946-1991) III

Operation Blacksmith II

Tue 17 Dec 2024

Ended

Cold War Theatre (1946-1991) III

ORBAT

Key information

Arma Reforger

Cold War Theatre (1946-1991) III

Operation Blacksmith II

Deploying

Situation

With the Saint-Pierre beachhead secured and friendly platoons making landings to provide further manpower, Blacksmith must now seize the command post at Montfort Castle. In order to further secure a satisfactory company line with sister platoons to the East, Blacksmith also requires the town of Regina- another Everon Military Force garrison. Anvil platoon has been dispatched after a quick re-kit in Saint-Pierre. Sister platoon Hammer is holding position in the town of Vernon at Victor Line after a heavy mass casualty from friendly fire. Continue reading

This ORBAT

Complete

Missing mods for US Army (1984) M81:

Open the mod preset

The ORBAT is for members.

Sign in to see who is deployed where, and what is still open.

Attributes

Time of day

Dawn

Weather

Clear Skies

Type

Conventional War

Forces

236

Deployment contacts

  • FL Runs the night and leads the ORBAT.
  • SA Runs the server and the mod set.
  • IO Runs the mission support team as the game master.

Campaign

Deployment III of the Cold War Theatre (1946-1991) campaign.

Open the campaign