UNITAF Future
UNITAF

Caution

This site is a work in progress

This site is finished to different degrees. Feedback is welcome. Please bear in mind that most of what you see, if not everything, is still a work in progress.

Data from the live site is synced here every hour. Anything you do on this site stays here. It is not copied back to the live site until we switch over.

Discord and permissions are linked. Be careful with admin actions. Some of them also change Discord.

Arma 3

Operation Valiant Guardian (2020) XXXIV

Sokolova Oluja

Thu 28 Mar 2024

Ended

Operation Valiant Guardian (2020) XXXIV

Operation order

Situation

Background Information

Sokolovi are continuing south with the aim of creating a "buffer" zone between Velke Hydčice and Camp Refošk.
The enemy is well entrenched, but with the Special Forces raiding the quarry the night before, our guns can now fire without a worry for a counter battery.

With the 72nd pushing westwards at the same time, and with the presence of a friendly SAM battery inside Camp Refošk, we expect the enemy will not push us with heavy equipment such as tanks or air assets.

Friendly Forces

1st Mechanized Battalion "Sokolovi" - C Coy, 1st Platoon;
- Platoon HQ
- 2x Squad

Supported by:
- 2x BOV Patria in UT30 30MK2 + SPIKE LR configuration
- 1x Command LKOV HMMW

- 1x Repair and recovery LKOV HMMW
- 1x Flatbed logistical truck

Field Artillery detachment:
- 3x 122 mm howitzer 2A18 - D30 located at Camp Refošk

Supporting Assets

- No civilians are expected in the designated AO.

Enemy Forces

- Entrenched infantry.
- Mechanized Infantry with APC and IFV capabilities.
- QRFs are expected to be mechanized infantry.

Mission

Tasking

Creating a "buffer" zone between Velke Hydčice and Camp Refošk.

End-state

Tynec and Hliney Ujezd liberated and under our control.

Execution

Commander's Intent

My intent is to use the the heavy fire support to soften the trenches and enemy positons and provide a smoke screen for the mechanized infantry to secure it

Tasks and Sequencing

PHASE 0 All elements should be ready too brief 15 min after operation starts and report fully kitted at RP- 0 Ready for last minute brief Viking 7 Wil pre- pepare firing request for Hammer callsign. Area marked for pre- planned are: Code named GOLF- # PHASE 1 Hammer will bombard G 1 and then proceed to provide smoke coverage for Viking to move in. VIKING 1 Wil take AP-1- A and secure sector S-2 , S-4, S-6 VIKING 2 Will take AP-2-A and secure sector S-1, S-3, S-5 Viking 7 is cleared to take out the trenches in Ssector G-2 After completing Phase 1 we will resupply on FRP Tango before setting of to phase 2 PHASE 2 Before step of too the last town viking 7 will organise smoke screen around G-S -2 marker to provide. VIKING 1 Will move and follow the blue line and assault AP 1-B VIKING 2 Will move and follow the blue line and assault AP 2-B Upon completing to secure the town we will regroup at a to be designated area for end ex. Recon pictures of AO First Trench system Logistical Base and FOB Tynec Outpost Tynec Trench System G -2 Town of Hlineny Ujezd Medical Camp Hlineny Ujezd

Administration/Logistics

Resupply

Ground hog will profide for Vehicle rearm of viking vehicles and atleast a full platoon log pack at FRP Tango

Any extra request will be put forward by Platoon leader

Medical

There is no medical evauation possible VIKING 8 Will provide medical support Hammer will have acces to rearm them self

Rules of Engagement

CPERS should be turned over to VIKING 9 for evacuationby GROUNDHOG 4 to the rear

Fire Support Plan

HAMMER 4-1 Will be on call via VIKING 7 FO ---> FSC Freq will be 75 VIKING 1 ,VIKING 2 Can contact VIKING 7 on LR freq 40

Command/Signal

Considerations

Signal - Red: enemy position - Orange: friendly vehicle requiring support - Purple: friendly MASCAS - Blue or Green: friendly position - White: concealment