Operation Fault Line (2018) XXXIV
Swordbreaker
Sun 8 Sep 2024
Ended
ORBAT
Key information
Operation Fault Line (2018) XXXIV
Swordbreaker
Deploying
Situation
As the sun prepares to settle for the day, US Rangers regroup for a last push across the riverbed, to capture the airfield and finally drive IS out of the capital for good... Continue readingThis ORBAT
Complete
Attributes
Deployment contacts
- FL Runs the night and leads the ORBAT.
- SA Runs the server and the mod set.
- IO Runs the mission support team as the game master.
Campaign
Deployment XXXIV of the Operation Fault Line (2018) campaign.
Open the campaign