Operation Fault Line (2018) XXXIV
Swordbreaker
Sun 8 Sep 2024
Ended
Operation Fault Line (2018) XXXIV
ORBAT
Key information
Operation Fault Line (2018) XXXIV
Swordbreaker
Deploying
Situation
As the sun prepares to settle for the day, US Rangers regroup for a last push across the riverbed, to capture the airfield and finally drive IS out of the capital for good... Continue readingThis ORBAT
Complete
Attributes
Deployment contacts
- FL Runs the night and leads the ORBAT.
- SA Runs the server and the mod set.
- IO Runs the mission support team as the game master.
Campaign
Deployment XXXIV of the Operation Fault Line (2018) campaign.
Open the campaign