UNITAF Future
UNITAF

Caution

This site is a work in progress

This site is finished to different degrees. Feedback is welcome. Please bear in mind that most of what you see, if not everything, is still a work in progress.

Data from the live site is synced here every hour. Anything you do on this site stays here. It is not copied back to the live site until we switch over.

Discord and permissions are linked. Be careful with admin actions. Some of them also change Discord.

UNITAF members taking orders before an operation
Force Manual

The FM outlines our core skills, policies and guides to ensure every member stands ready for the mission ahead.

FM/BG-1509 · v1.04

Interpreting ORBAT Construction Standards

Code
FM/BG-1509
Kind
Guide
Version
v1.04 8mos ago
Views
372
Platforms
As its document
Published by
LtCol James 9 Feb 2026
Last material change
v1.00 Initial Version

Interpreting ORBAT Construction Standards

The purpose of this content is to provide policy guidance on the construction of ORBAT and the rules by which ORBATs are approved. It's important to note that these policies may be an extension of other policies, or impacted by them.

These policies are designed to cover the majority of encountered questions in ORBAT construction, although for flexibility we acknowledge that not all circumstances will be covered. In this instance, as with other policies Doctrine Authority FM/BP-859 applies and Operations Command (OC) FM/BG-614 is the relevant Command Unit Authority.

See The UNITAF Way FM/C149 for more information on doctrine and what happens if a specific instance is not covered by this section.