UNITAF Future
UNITAF

Caution

This site is a work in progress

This site is finished to different degrees. Feedback is welcome. Please bear in mind that most of what you see, if not everything, is still a work in progress.

Data from the live site is synced here every hour. Anything you do on this site stays here. It is not copied back to the live site until we switch over.

Discord and permissions are linked. Be careful with admin actions. Some of them also change Discord.

UNITAF members taking orders before an operation
Force Manual

The FM outlines our core skills, policies and guides to ensure every member stands ready for the mission ahead.

FM/BG-1523 · v2.00

Rendezvous (RVs) and Emergency Rendezvous (ERVs)

Code
FM/BG-1523
Kind
Guide
Version
v2.00 4mos ago
Views
237
Platforms
As its document
Published by
Cpl Ross 24 May 2026
Last material change
v2.00 Added missing FRV information

You are reading v2.00, an earlier version. Read the current version

Rendezvous (RVs) and Emergency Rendezvous (ERVs)

Definitions

  • RV (Rendezvous):
    • A planned link-up point where elements meet during movement or prior to execution.
  • ERV (Emergency Rendezvous):
    • A pre-designated rally point used if elements become separated, break contact, or lose communication.
  • FRV (Final Rendezvous):
    • The last designated assembly point immediately prior to initiating an attack. It is used to consolidate all assault elements, confirm final readiness, and complete last-minute coordination before crossing the line of departure or beginning the final assault phase.

When to Use

  • RVs can be used in all operations.
  • ERVs are used when elements become separated or C2 is degraded.
  • FRVs are used specifically during offensive operations as the final consolidation point before execution of an attack.

Best Practices

  • Anchor to recognizable terrain.
    • Use intersections, buildings, terrain features, or distinct map references.
  • Keep locations practical.
    • Avoid exposed or tactically unsound areas.
  • Assign purpose clearly.
    • RV: Planned link-up during movement
    • ERV: Emergency regroup point
    • FRV: Final consolidation prior to assault
  • Limit quantity.
    • Over-designating rendezvous points causes confusion.

Execution Considerations

  • At an RV:
    • Confirm accountability
    • Conduct quick coordination
    • Adjust plan if required
    • Conduct medical and/or resupply
  • At an ERV:
    • Establish security
    • Rebuild command and control
    • Await further direction
  • At an FRV:
    • Conduct final accountability of assault elements
    • Confirm weapons, ammunition, and readiness status
    • Rehearse or confirm assault plan and timing
    • Synchronise final fire support or enabling assets
    • Issue final go/no-go confirmation before execution

Communication

Use concise reporting:

  • “1-1 set at RV.”
  • “All elements at FRV.”
  • “Breaking contact to ERV.”
Example RVs for town objective.
Example RVs for town objective.

Where it appears

On role cards